Scenarios: • Collapse of a ceiling, caused by heavy rainfall • The failure of the HVAC system • A major piece of plant/machinery failure within the facility For each of the scenarios listed above, answer the three following questions: • What controls are in place to manage the risk? • What is the likelihood of the risk occurring? • What are the consequences if the risk should occur? • Develop and complete a risk matrix • List the relevant parties and how you would communicate with and seek input from them • Develop a contingency plan for treatment of the risk • Develop a risk register • Develop a risk treatment schedule • Include a method or strategy to monitor and review the assessment

Scenarios:

• Collapse of a ceiling, caused by heavy rainfall
• The failure of the HVAC system
• A major piece of plant/machinery failure within the facility

For each of the scenarios listed above, answer the three following questions:

• What controls are in place to manage the risk?
• What is the likelihood of the risk occurring?
• What are the consequences if the risk should occur?

• Develop and complete a risk matrix

• List the relevant parties and how you would communicate with and
seek input from them

• Develop a contingency plan for treatment of the risk

• Develop a risk register

• Develop a risk treatment schedule

• Include a method or strategy to monitor and review the assessment